Nuclear Power Plant Engineering Intern
PG&E Diablo Canyon Nuclear Power Plant |
June 2016-August 2016
San Luis Obispo, California |
- Developed technical procedures for nuclear power plant control room simulator saving time and company resources.
- Identified and documented deficiencies within software resulting in increased accuracy and reduced implementation times.
- Analyzed power plant piping schematics and identified areas of high risk allowing the company to increase plant safety and component longevity.
Engineering Teaching Assistant
Arizona State University |
August 2015-May 2016
Mesa, Arizona |
- Conducted a senior level college lecture to a class of 50 students resulting in increased success rates.
Tutoring Center Specialist
Universal Technical Institute |
August 2010-May 2013
Avondale, Arizona |
- Developed and implemented a proprietary data entry system in Microsoft Excel increasing accuracy of trending reports while reducing data entry time.
- Assumed a leadership role directing a crew of workers which boosted productivity and team morale.